YueGuobin
382b2aefa9
docs: add link creation templates section to roadmap
...
Add comprehensive link creation templates documentation covering:
- Batch link creation workflow with HITL confirmations
- Link template schema with pattern-based connectivity
- Common topology patterns (Spine-Leaf, Ring, Mesh, Star, Three-tier)
- Intelligent port allocation strategies (round-robin, optimized)
- Performance benchmarks showing 99.9% token savings for large topologies
- Complete workflow example combining all three template systems
2026-03-20 09:44:03 +08:00
YueGuobin
3b4bc93e85
docs: add node creation templates section to roadmap
...
Added comprehensive node creation template system including:
- Batch node creation workflow (HITL with preview)
- Node template schema (groups, positioning, auto-linking)
- Automatic positioning algorithms (grid, spine-leaf, hierarchical)
- Auto-linking strategies (mesh, paired, linear)
- Batch parallel execution (20-50 concurrent)
- Performance benchmarks for 100-1000+ nodes
- Complete enterprise data center example (724 nodes, 4280 links)
Key benefits:
- 98% token savings for node creation (5000 → 100 tokens for 100 nodes)
- 90% time savings (10 min → 1 min for 100 nodes)
- Auto-linking eliminates manual connection setup
- Combined workflow: Create + configure 724 nodes in ~10 minutes
Updated implementation phases to include Phase 2.5 for node creation templates.
2026-03-20 09:35:45 +08:00
YueGuobin
a627d45ca6
docs: add large-scale topology support (1000+ nodes) to roadmap
...
Added comprehensive section on large-scale topology support including:
- Direct execution mode (skip AI, use rule engine)
- Batch parallel execution (50-100 concurrent)
- Intelligent parameter generation (0 token cost)
- Real-time progress streaming
- Configuration summary generation
- Performance benchmarks for 1000+ nodes
- Multiple addressing schemes (sequential, VLAN-based, hierarchical)
Key benefits:
- 99.5% token savings for 1000 devices (150K → 400 tokens)
- 88% time savings (50 min → 3-5 min)
- Enables rapid provisioning of training labs, CI/CD testing, disaster recovery drills
Updated implementation phases to reflect large-scale support priorities.
2026-03-20 09:26:45 +08:00
YueGuobin
5c42a59413
docs: add template-based configuration roadmap with HITL workflow
...
Add comprehensive roadmap for implementing Jinja2 template-based
configuration with Human-in-the-Loop confirmations.
Key features:
- Three-step HITL workflow (Template → Parameters → Execute)
- 70-80% token savings for multi-device configurations
- Enhanced safety through human review at each step
- Template reusability across projects
Implementation plan:
- Phase 1: Core MVP (3-5 days)
- Phase 2: UX Enhancement (2-3 days)
- Phase 3: Template Library (2-3 days)
- Phase 4: Advanced Features (3-4 days)
2026-03-20 01:18:56 +08:00