YueGuobin
77a38cef03
docs: clarify system scope - baseline config with tool handoff
...
Clarify the positioning of the template-based system:
Scope (0 → 1):
- Topology provisioning (nodes + links)
- Baseline configuration (IP, routing protocols)
- Management access setup (SSH/HTTPS/NETCONF)
- Basic security configuration
Handoff to Production Tools (1 → N):
- Terraform (Infrastructure as Code)
- REST API (modern device management)
- NETCONF/YANG (standardized configuration)
- Network Controllers (SDN, APIC, etc.)
This clarifies that:
1. The system focuses on rapid environment preparation
2. It complements rather than replaces production tools
3. It's ideal for labs, testing, training, and initial setup
4. Advanced config management is handled by specialized tools
2026-03-20 10:00:23 +08:00
YueGuobin
76c84798dc
docs: refactor roadmap - reduce code, add comprehensive diagrams
...
Major documentation improvements:
Reduced Code Content (~60% reduction):
- Simplified Core Components section with concept-focused descriptions
- Condensed Large-Scale Topology section (kept concepts, removed implementation)
- Streamlined Node Creation Templates (kept workflows, removed tool code)
- Simplified Technical Considerations (kept diagrams, removed code)
- Streamlined Testing Strategy (kept test cases, removed test code)
Added Comprehensive Diagrams:
- System Architecture Overview (4-layer architecture)
- HITL State Transition Diagram (complete workflow with interrupts)
- REST API Endpoints (6 new endpoints with request/response formats)
- SSE Progress Stream (real-time event types)
- Data Flow Diagram (7-step process from user to results)
- Error Handling Flow (4 error types with recovery strategies)
- Template Lifecycle Management (5 stages from DRAFT to ARCHIVED)
- Automatic Layout Strategies (4 layout types with visual examples)
- Auto-Linking Strategies (4 link pattern types with diagrams)
- Security Considerations (3-layer validation approach)
- Error Categories (4 error types with recovery flows)
- Testing Strategy (unit, integration, E2E test scenarios)
Benefits:
- Easier to understand for non-technical stakeholders
- Focus on concepts and workflows rather than implementation
- Visual documentation aids comprehension
- Maintained all critical technical information
- Improved readability and structure
2026-03-20 09:54:58 +08:00
YueGuobin
382b2aefa9
docs: add link creation templates section to roadmap
...
Add comprehensive link creation templates documentation covering:
- Batch link creation workflow with HITL confirmations
- Link template schema with pattern-based connectivity
- Common topology patterns (Spine-Leaf, Ring, Mesh, Star, Three-tier)
- Intelligent port allocation strategies (round-robin, optimized)
- Performance benchmarks showing 99.9% token savings for large topologies
- Complete workflow example combining all three template systems
2026-03-20 09:44:03 +08:00
YueGuobin
3b4bc93e85
docs: add node creation templates section to roadmap
...
Added comprehensive node creation template system including:
- Batch node creation workflow (HITL with preview)
- Node template schema (groups, positioning, auto-linking)
- Automatic positioning algorithms (grid, spine-leaf, hierarchical)
- Auto-linking strategies (mesh, paired, linear)
- Batch parallel execution (20-50 concurrent)
- Performance benchmarks for 100-1000+ nodes
- Complete enterprise data center example (724 nodes, 4280 links)
Key benefits:
- 98% token savings for node creation (5000 → 100 tokens for 100 nodes)
- 90% time savings (10 min → 1 min for 100 nodes)
- Auto-linking eliminates manual connection setup
- Combined workflow: Create + configure 724 nodes in ~10 minutes
Updated implementation phases to include Phase 2.5 for node creation templates.
2026-03-20 09:35:45 +08:00
YueGuobin
a627d45ca6
docs: add large-scale topology support (1000+ nodes) to roadmap
...
Added comprehensive section on large-scale topology support including:
- Direct execution mode (skip AI, use rule engine)
- Batch parallel execution (50-100 concurrent)
- Intelligent parameter generation (0 token cost)
- Real-time progress streaming
- Configuration summary generation
- Performance benchmarks for 1000+ nodes
- Multiple addressing schemes (sequential, VLAN-based, hierarchical)
Key benefits:
- 99.5% token savings for 1000 devices (150K → 400 tokens)
- 88% time savings (50 min → 3-5 min)
- Enables rapid provisioning of training labs, CI/CD testing, disaster recovery drills
Updated implementation phases to reflect large-scale support priorities.
2026-03-20 09:26:45 +08:00
YueGuobin
5c42a59413
docs: add template-based configuration roadmap with HITL workflow
...
Add comprehensive roadmap for implementing Jinja2 template-based
configuration with Human-in-the-Loop confirmations.
Key features:
- Three-step HITL workflow (Template → Parameters → Execute)
- 70-80% token savings for multi-device configurations
- Enhanced safety through human review at each step
- Template reusability across projects
Implementation plan:
- Phase 1: Core MVP (3-5 days)
- Phase 2: UX Enhancement (2-3 days)
- Phase 3: Template Library (2-3 days)
- Phase 4: Advanced Features (3-4 days)
2026-03-20 01:18:56 +08:00